Safety Bath Walk-In Tubs

Easy access tubs & showers made in Canada & installed by Logic Safety Bath located in Regina Saskatchewan. Logic Safety Bath will install your new easy access tub or shower and complete your entire bathroom renovation including heated floors, new vanities, flooring or tile install, bidet toilet seat attachments and safety hand bars.

THRCL Trusted Trades

Electrical, Plumbing & Heating, Air Conditioning, Residential Roofing , Drywall Installation & Finishing, Painting, Flooring & Tile, Eavetrough, Siding, Soffit & Fascia , Window & Doors, Kitchen Renovations, Decks & Handrails, Fences, Concrete, Stone, Brick & Masonry

Construction processes

In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.

The best modern trend in design is toward integration of previously separated specialties, especially among large firms. In the past, architects, interior designers, engineers, developers, construction managers, and general contractors were more likely to be entirely separate companies, even in the larger firms. Presently, a firm that is nominally an “architecture” or “construction management” firm may have experts from all related fields as employees, or to have an associated company that provides each necessary skill. Thus, each such firm may offer itself as “one-stop shopping” for a construction project, from beginning to end. This is designated as a “design build” contract where the contractor is given a performance specification and must undertake the project from design to construction, while adhering to the performance specifications.

Several project structures can assist the owner in this integration, including design-build, partnering and construction management. In general, each of these project structures allows the owner to integrate the services of architects, interior designers, engineers and constructors throughout design and construction. In response, many companies are growing beyond traditional offerings of design or construction services alone and are placing more emphasis on establishing relationships with other necessary participants through the design-build process.

Nuclear and fossil power plants

A nuclear power plant or nuclear power station is a thermal power station in which the heat source is a nuclear reactor. As is typical in all conventional thermal power stations the heat is used to generate steam which drives a steam turbine connected to an electric generator which produces electricity. As of 23 April 2014, the IAEA report there are 435 nuclear power reactors in operation, operating in 31 countries. Nuclear power stations are usually considered to be base load stations, since fuel is a small part of the cost of production.Their operations and maintenance (O&M) and fuel costs are, along with hydropower stations, at the low end of the spectrum and make them suitable as base-load power suppliers. The cost of spent fuel management, however, is somewhat uncertain.

Electricity was generated by a nuclear reactor for the first time ever on September 3, 1948 at the X-10 Graphite Reactor in Oak Ridge, Tennessee in the United States, and was the first nuclear power station to power a light bulb. The second, larger experiment occurred on December 20, 1951 at the EBR-I experimental station near Arco, Idaho in the United States. On June 27, 1954, the world’s first nuclear power station to generate electricity for a power grid started operations at the Soviet city of Obninsk. The world’s first full scale power station, Calder Hall in England opened on October 17, 1956. The world’s first full scale power station, solely devoted to electricity production (Calder Hall was also meant to produce plutonium), Shippingport power plant in the United States connected to the grid on December 18, 1957.

The conversion to electrical energy takes place indirectly, as in conventional thermal power stations. The fission in a nuclear reactor heats the reactor coolant. The coolant may be water or gas or even liquid metal depending on the type of reactor. The reactor coolant then goes to a steam generator and heats water to produce steam. The pressurized steam is then usually fed to a multi-stage steam turbine. After the steam turbine has expanded and partially condensed the steam, the remaining vapor is condensed in a condenser. The condenser is a heat exchanger which is connected to a secondary side such as a river or a cooling tower. The water is then pumped back into the steam generator and the cycle begins again. The water-steam cycle corresponds to the Rankine cycle.

General Construction

Construction is the process of constructing a building or infrastructure.Construction differs from manufacturing in that manufacturing typically involves mass production of similar items without a designated purchaser, while construction typically takes place on location for a known client.Construction as an industry comprises six to nine percent of the gross domestic product of developed countries. Construction starts with planning, design, and financing; and continues until the project is built and ready for use.

Large-scale construction requires collaboration across multiple disciplines. An architect normally manages the job, and a construction manager, design engineer, construction engineer or project manager supervises it. For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider zoning requirements, the environmental impact of the job, the successful scheduling, budgeting, construction-site safety, availability and transportation of building materials, logistics, inconvenience to the public caused by construction delays and bidding, etc. The largest construction projects are referred to as megaprojects.